• Achieving more growth with ease

    Meier Logistik

Scroll

Our customer

At Kofferprofi.de, customers can choose from more than 100,000 high-quality bags, satchels, jewellery cases and travel luggage from different suppliers. The online shop of Horst Condé GmbH has grown continuously over the past few years. Globetrotters, business travellers, fashionistas, recreational athletes or parents who are looking for comfortable and stylish school supplies for their children – everyone is sure to find the right accessories at Kofferprofi.de. High-quality suitcase brands such as Samsonite or Rimowa, business cases and briefcases from Bugatti and Porsche Design, selected small leather goods such as belts or wallets from The Bridge and Braun Büffel, women's handbags from Picard, JOOP! & Mollerus. There are also school bags and backpacks from Scout and McNeill, Satch, 4You, Coocazoo, Dakine and Take It Easy. For leisure and sport, the online retailer offers cult brands such as Ridgebake, Deuter, Fjällräven and High Sierra. “Our range now includes more than 100,000 products from almost 90 manufacturers,” says Stefan Maurer. The graduate in business administration is a member of the management team and founder of the online shop. Since mid-January 2017, his office has been on the upper floor of the new logistics centre in the Lisdorfer Berg industrial park in Saarlouis. "Everything here is new," he remarks. "So new that even navigation systems can't find our address – yet.”

 

Initial situation and customer requirements

    • The retailer's goal is to have all the desired items in stock. This places high demands on intralogistics.
    • On average, around 800 to 1,000 suitcases, handbags and school bags leave the company premises every day.
    • A new building was inevitable if all deliveries were to reach customers on time. Since its foundation, Kofferprofi.de has recorded continuous growth.
    • “Customers appreciate the convenience of the Internet, but above all our extensive range and our reliability: If we receive the request by 3 p.m., we will send the goods out on the same day,” emphasizes Stefan Maurer.
    • The rented warehouses became too small and the material flows inefficient.

The BITO Solution

    • We installed a three-tier shelving system with a floor area of 1,250 square meters and a height of 7.5 meters. With this solution, a very good degree of land use can be achieved.
    • The special thing about the system: Each floor is divided up exactly in the same way. An area of almost 3,000 square meters is available per floor for large compartments type A. Up to four suitcases fit in one compartment. And around 3,000 square meters are intended for compartment types B and C. This area stores more compact goods packed in cardboard boxes such as handbags and small items such as purses. This means that Kofferprofi.de has a total usable area of almost 6,000 square meters on every level.
    • Fire protection was also an important issue. In order to avoid an expensive sprinkler system, the company invested in a holistic fire protection concept.

On-site application

    • 7,000 shelves on three floors offer Kofferprofi.de storage space and the ability to react quickly and flexibly in the e-commerce business.
    • It is important for the customer that on-time delivery can be guaranteed.
    • Smooth intralogistics is essential.

Customer benefits

    • Kofferprofi.de was able to expand its portfolio by 6,000 articles.
    • With its height, the system makes optimal use of the space in the warehouse.
    • On-time delivery is guaranteed.
    • The new system made it possible to close expensive external warehouses that were cumbersome in terms of the process flow. The order pickers are also pleased.

What our customers say

Stefan Maurer is very satisfied with his new logistics centre and its implementation. "Once the building was up, everything went quickly and smoothly – especially the quick and uncomplicated assembly and commissioning of the shelving solution by the BITO employees," says the managing director enthusiastically. The warehouse is currently around 80 percent full. “This means we can continue to pursue our ambitious goals with the new logistics centre,” says Stefan Maurer. And what do they look like? “We want to grow by 15 percent annually,” he is confident.

Have we persuaded you?

We look forward to hearing from you:
02476 388852

BITO Newsletter